What a rollout actually takes
The licence is the smaller line on the budget. The work is in three places.
First, the routing rules. Somebody has to decide, in writing, how orders should flow: which location wins a tie, when an order is allowed to split, what happens to a backorder. Vendors will configure whatever you give them. They cannot tell you what your margin needs.
Second, the connections. The OMS has to talk to the store, the ERP, every marketplace, the warehouse system and the carriers, and each of those links needs failures you can see when they happen. This is usually the part that was under-scoped, and it is most of what our system integrations work consists of.
Third, the cutover. Run one channel through the new system first and leave it alone for a few weeks before adding the next. Routing mistakes only show up at volume, and a peak-season cutover is how a fulfilment upgrade turns into a customer service crisis.
Typical timelines run from a few weeks for a single-channel store to several months for a retailer with shops, marketplaces and wholesale on one stock pool. Most of the variance comes from data quality, not from the software.